Report proyect
In our
proyect the advances is are significant because the desing is ready, being of wood but only the assembly is not finished
because the material is not enough, the material mention is wood , our team now
purchase more wod for complete the areas who need cover and based in the electronic no have problems
only need a taste and some materials who put inside the mechanism like LEDS,
motors, encoder, sensors only need incorporade this things in the mechanism, in
the part of programming is slow because in my team the nivel in programming is
slow and the taste in this area is required for the motion of mechanism, in
conclusion the mechanis is 50 porcent assembly the part of desing is almost
finished only need material a cover , in the part or electronic needs taste and
incorporate all electronic inside the mechanism , now in the part or programming
is the word slow but all team make a big effort for finished in your completely
the mechanis works toght for finish